Science Current Events | Science News | Brightsurf.com
 

SOUTH AFRICA: Project feasibility study for proposed $55,000,000 electrolytic manganese dioxide (EMD) plant is tentatively scheduled for completion by ... on Mining, Metal Making and Conversion | Digital

by Worldwide Projects, Inc. (Publisher)

List Price: $5.95  
Available:  Available for download now

Binding:  Digital
Publisher:  Worldwide Projects, Inc.
Page Count:  7 Pages
Publication Date:  September 01, 2003


EDITORIAL REVIEWS


Product Description
This digital document is an article from WWP-Report on Mining, Metal Making and Conversion, published by Worldwide Projects, Inc. on September 1, 2003. The length of the article is 1940 words. The page length shown above is based on a typical 300-word page. The article is delivered in HTML format and is available in your Amazon.com Digital Locker immediately after purchase. You can view it with any web browser.Citation DetailsTitle: SOUTH AFRICA: Project feasibility study for proposed $55,000,000 electrolytic manganese dioxide (EMD) plant is tentatively scheduled for completion by the end of January 2004, US TRADE & DEVELOPMENT AGENCY (TDA) & NEXANT INC. [USA] - Order #: 095503.Publication: WWP-Report on Mining, Metal Making and Conversion (Magazine/Journal)Date: September 1, 2003Publisher: Worldwide Projects, Inc.Volume: 12 Issue: 09Distributed by Thomson Gale
© 2009 BrightSurf.com